Course Syllabus
Course Title & Number: VCT 183 Finishing and Trim Work (2 credits)
Time/Days/Location: 8:30am – 11:30am Tues/Thursday WorkShop
Instructor: Jeff Steel
Office Location: Vocational Main Office Office Hours: 8:00am - 4:30pm (MTT)
Phone: 320-4051 Fax: 320-3799 Email: jeffsteel@comfsm.fm
Course Required Materials:
1. Instructor Handouts
2. Scientific calculator
3. Notebook and pencils
Dress and Footwear Requirements: Due to the nature of this course, specific clothing and footwear are mandatory for attendance to be permitted under OH&S rules. To be explained during enrollment.
Evaluation:
Final Grade for this course will be based on meeting the course requirements at the following percentage rate:
90% -100% A – Superior Mid term Exam 20%
80% - 89% B – Above Average Practical 40%
70% - 79% C – Average Drawings 10%
60% - 69% D – Below Average Final Exam 30%
0 % - 59% F – Failure
Attendance:
Students who are absent for more than two classes will be automatically dropped from the course.
Course Description: VCT 183 Finishing and Trim Work (2)
Prerequisites:
VCT 153
This course is
designed to teach the student about various methods and materials necessary to
finish the interior of a residential or commercial building. The course covers
the installation of wall and ceiling panels, installation of windows and doors,
application of trim and moldings and installation of finishing hardware.
Schedule for Semester. (Note – schedule may change to suit local needs.)
No. |
WEEK |
MON |
TUES |
WED |
THURSDAY |
FRI |
1 |
01/20/03 |
|
Blueprints |
|
Practical |
|
2 |
01/27/03 |
|
Wall
Finishes |
|
Practical |
|
3 |
02/03/03 |
|
Wall
Finishes |
|
Practical |
|
4 |
02/10/03 |
|
Ceiling
Finishes |
|
Practical |
|
5 |
02/17/03 |
|
Ceiling
Finishes |
|
Practical |
|
6 |
02/24/03 |
|
Floor
Finishes |
|
Practical |
|
7 |
03/03/03 |
|
Mid
term |
|
Mid
term |
|
8 |
03/10/03 |
|
Floors
Finishes |
|
Practical |
|
9 |
03/17/03 |
|
Door
Frames |
|
Practical |
|
10 |
03/24/03 |
|
Door
Frames |
|
Practical |
|
11 |
03/31/03 |
Holiday |
Window
Frames |
|
Practical |
|
12 |
04/07/03 |
|
Window
Frames |
|
Practical |
|
13 |
04/14/03 |
|
Window
Frames |
|
Practical |
Holiday |
14 |
04/21/03 |
|
Hardware
Installation |
|
Practical |
|
15 |
04/28/03 |
|
Hardware
Installation |
|
Practical |
|
16 |
05/05/03 |
|
|
|
Final
Exam |
|
Spring
Semester 2003
January 6 Spring
Semester Begins
January 7-10 Registration
January 10 Faculty
Meeting
January 10 Holiday—Kosrae
Constitution Day observed
January 13 First
Day of Instruction
January 13-14 Late
Registration
January 17 Last
Day to Add/Drop Courses
January 20 Class
Lists Due from Instructors
January 27 Deadline
for Applications for Graduation
February 3-14 Entrance
Testing at the High Schools
February 7 Early
Warning Deficiency Reports Due from Instructors
February 21 Staff
Development Day—No Classes (Pohnpei)
February 27-28 Holiday—Yap
Day (observed)
March 3-4 Mid-Term
Evaluations
March 7 Mid-Term
Deficiency Notices Due from Instructors
March 17-28 Recruitment
Trip
March 21 Last
Day to Withdraw With “W”
March 31 Holiday—Cultural
Day (Pohnpei & Chuuk)
April 1 Holiday—Founding
Day
April 2-4 Course
Selection for Summer and Fall
April 14-25 Early
Registration
April 16-17 Easter
Recess for Students
April 18 Holiday—Good
Friday
May 9 Holiday—FSM
Constitution Day observed
May 12 Last
Day of Instruction
May 13-15 Final
Exams
May 19 Final
Grades Due From Instructors
May 22 Graduation
Day/Spring Semester Ends
May 26-30 Entrance
Testing at the State Campuses
STUDENT |
Mid Term |
Practical |
Drawings |
Final
|
Attendance |
Final
Result |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|